Your elevator supplier will take care of all the wiring and related code requirements for the elevator cab and the various controls. Something went wrong. +90 (216) 348 4876, India Office This is the area within the hoistway beneath the car, and there are occasions when elevator technicians have to work in this area for maintenance and troubleshooting. Part VIII, Machine Rooms, Control Rooms, Machinery Spaces, and Control Spaces, states elevator and similar-installation driving machines, motor-generator sets, motor controllers and disconnecting means are to be installed in a room or space set aside for that purpose. z!0: - [Content_Types].xml ( n0EUb*>-RxV=QUAl"93dFk%Y?l}MGDV With the elevator car at the bottom landing, it is the length of cable as measured from the point of suspension in the hoistway to the bottom of the loop. Cloudflare Ray ID: 7a2fbe9ebd7e2fe8 For example, wiring that is under exclusive utility control and has to do with the generation and distribution of electrical power is not NEC regulated. Article 620s Definitions section includes two terms that describe spaces not attached to the outside of a hoistway. Have wiring identified for use in wet locations in accordance with the requirements in NFPA 70. The fire loading resulting from an accumulation of abandoned low-voltage cabling may be considerable, and has to be understood and dealt with. Conductors supplying more than one motor, motor controller or power transformer are to have an ampacity not less than the sum of the nameplate current ratings of the equipment plus all other connected loads. Heating and air-conditioning equipment located on the car must not be in excess of 600 V. All live parts of electrical apparatuses are to be enclosed to protect workers and the public against accidental contact. , !! . Working spaces for electrical equipment that may have to be examined, adjusted, serviced or maintained is required in all occupancies in an earlier NEC section, 110.26(A). In order to aid enforcement, the panel additionally required marking the available fault current at the elevator controller. A little more narrowly focused (yet of great consequence) is the ubiquitous NEC, which, in the National Fire Protection Association (NFPA)s venerable Handbook edition, devotes 18 double-column pages to electrical design and installation requirements for elevators, escalators and related equipment. For platform lifts and stairway chairlifts, the duty is intermittent. All equipment in a machine room-less design is installed within the elevator shaft or exterior compartment near the elevator shaft, including the elevator controller and the elevator disconnecting means. This device must be either a fused disconnect or a circuit breaker because ANSI/ASME A17.1 requires you to install an additional overcurrent protection device (OCPD) in the elevator equipment room. In Part One of this series (ELEVATOR WORLD, April 2012), we began an examination of National Electrical Code (NEC) 2011 mandates for elevators and related equipment installations. If you can illuminate the pit using lights that are "above the top of the pit" (whatever that . 3. Selective coordination is also required for multiple elevators per NEC 620.62. A surge of immigration to the U.S., the end of slavery and, on both sides of the Atlantic Ocean, a burgeoning industrial revolution ignited an acceleration in new building. Additional branch circuits are to supply other utilization equipment not covered above. Jul 15, 2021. The traveling cable, moreover, may be run without raceway from inside the hoistway to elevator-controller enclosures and to the elevator car and machine room and similar locations outside the hoistway for a distance not exceeding 6 ft. Here again, the lighting is not to be connected to a GFCI, whereas such protection is required for the receptacle(s). The vast majority of equipment serving the elevator is located within this room (i.e., elevator controller). Even non-composite fiber-optic cable, which does not carry electrical energy, is subject to the code. If the equipment must remain energized to perform work, effective insulation and safe electrical working practices should be observed. proved for elevator locations - car, hoistway, pit and a-chine roo equireents in Article odify the articles in Chap - ter For eaple, it is stated that the cross-sectional area Auxilliary gutters are permitted in machine and control rooms between controllers, starters and similar apparatuses. The code is not concerned with the efficiency or sophistication of equipment that it covers, except insofar as safety (in terms of human injury and property damage) is concerned. 6 Stop Switch in Pits There shall be installed in the pit of each elevator an ASME A17.1 CODE enclosed stop switch or switches meeting the requirements The following material is reprinted with permission from the American of 2.26.2.7 and 2.2.6.1 through 2.2.6.3. Part IX, Grounding, states that metal raceways, Type MC cable, Type MI cable or Type AC cable attached to elevator cars are to be bonded to metal parts of the car bonded to the equipment grounding conductor. However, it is likely that for many elevator controllers, this may not be high enough for the available fault current where they will eventually be installed. NEC Guidelines on Commercial Garages. The code exempts some fairly broad areas where compliance is not expected. Each fused switch or circuit breaker in the panelboard is used as an elevator disconnect. This is important as the tradition of using only time-current curves for the analysis of overcurrent device operation is usually not sufficient since the time-current curves traditionally stop at 0.01 second (not time zero). Many professionals believe the NEC is applicable only for voltages over a certain level, but that is not the case. Use the below learning-reinforcement questions to study for the Continuing Education Assessment Exam available online at www.elevatorbooks.com or on page 111 of this issue. Name the principal code other than NEC that pertains to elevator design/installation. What is the definition of the machine room? Why are voltage limitations important? In which areas must live parts be enclosed? Why are feeder demand factors permitted for multiple elevators? NEC 70620.85 Smoke detectors to recall elevators on Phase I recall are required to be located on each landing, They must be in enclosures with doors or removable panels that can be locked in the closed position. You can email the site owner to let them know you were blocked. Electricity is often one of the initial services to fail during a storm. The branch circuit is to be protected by an overcurrent device located in the machine room, control room/machinery space or control space. The most complex of these is the elevator. Years may lapse between the design and installation stages of a project. Hoistway pit lighting and receptacles 5. Of particular importance is the location of the disconnecting means so it can be found by an individual who may not be familiar with the installation. It is of great importance that power to the various elevator functions can be quickly and reliably removed from the loads in case of emergency or for maintenance and troubleshooting. ), advise the building owner to correct the condition. Acceptable types of wire for this application are given in Table 400.4, which occurs in an earlier chapter and lists various types of elevator cable for lighting and control in both unclassified and hazardous locations. of the sprinkler heads. He participates in IEEE (Senior Member) with Industrial and Commercial Power Systems, NEMA (member of the Codes & Standards Committee), NFPA (committee member for NEC CMP-13 and NFPA 79), UL (508/60947 and 508A) and IAEI activities. NEC Article 0: Elevator art by David Herres Continued. Even though Edison grasped the basic ideas of fusing and overcurrent protection, many hazards remained. Required lighting shall not be connected to the load side of a ground-fault circuit interrupter. (Cross-sectional areas of conductors are given in Chapter 9, Tables 5 through 8. 354 Morgan Ave. First, you'll need to install lighting in the elevator equipment room (Photo 1) and shaft pit (Photo 2). They are differentiated from other similar structures by the fact that they are not attached to the outside perimeter or surface of the walls, ceiling or floor of the hoistway. Hammurabi, sixth king of Babylon and creator of the Babylonian Empire, decreed: If a builder builds a house for someone and does not construct it properly, and the house which he built falls in and kills its owner, then that builder shall be put to death. NEC has a further note that the term wheelchair lift has been changed to platform lift.. ASME A17.1 . It is important for design engineers to communicate this with the architect and owner during the design phase, as it will impact space needs elsewhere in the facility to accommodate electrical equipment. In some cases, it may require a means to test the shunt trip operation or have one contact operate the shunt trip of more than one elevator. Marking the elevator controller short-circuit current rating (SCCR) by the elevator controller manufacturer. ranged from 0.06 cal/cm2 to 0.95 cal/cm2, which indicates that the arc-flash hazard to employees is primarily to the hands and arms. It is of great importance for the design engineer to communicate with their local authority having jurisdiction (AHJ) to determine fire alarm requirements for the respective elevator installation. The cover shall be secured and level with the pit floor. (g) Stop Switch in Pits. This is something that can be easily accomplished if the elevator controller manufacturer uses components in combination with overcurrent protective devices that are tested and listed with high combination SCCRs. -inch conduit is needed to the sump pump. Hint: Duct Tape to the Rescue, NEC: Air Conditioning and Refrigerating Equipment Part 5. Part VII, Overcurrent Protection, divides this topic into four categories for elevators and similar equipment, depending upon the nature of the specific equipment: For operating devices and control and signaling circuits, protection against overcurrent is in accordance with the requirements of Sections 725.43 and 725.45. I've never run into this before. Hydraulic reservoir characteristic of a hydraulic-piston-operated elevator. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. The Uniform Building Code requires two-way communications between the central command center and the elevators, each elevator lobby, emergency power rooms, and by entries into enclosed stairways (Section 403.5.3). However, this can vary depending on building conditions and exterior grade. The feeder OCPD needs to remain closed so the remaining elevators have power and continue to function. Similarly, underground wiring in mines is not NEC regulated, although other, non-mine wiring below ground (such as lighting in an underground traffic tunnel) is covered. If a hydraulic elevator loses power because a heat detector goes off or for any other reason it could trap occupants for an unpleasant amount of time. Cross-sectional areas of wireways are found by multiplying the two interior dimensions.) The electrical system designer calculates the maximum available fault current at the elevator controller. Your IP: Flexible cords and cables in lengths not to exceed 6 ft. of a flame-retardant type and located to be protected from physical damage are permitted in machine rooms without being installed in a raceway. Similar provisions are attached to elevator-car heating and air-conditioning disconnecting means, and to other utilization equipment. For this reason, the NEC provides for adequate working space around electrical equipment that may need to be serviced. 953 0 obj
<>
endobj
Overcurrent devices protecting these branch circuits are to be located in the machine room or similar location. These are the principle NEC 2011 Article 620 mandates. The Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities (ADAAG) now require the cab to have a special phone accessible by individuals with disabilities. Receptacle for pumps located in the pit shall be a single non-GFCI and shall be located 6 inches above the lowest landing. NFPA 72 requires the control circuit between the Fire Alarm System and the shunt trip be monitored for integrity. Elisha Otis safety elevator, introduced in 1853, prevented the fall of the car if the cable broke. In case of emergency, electricians, maintenance personnel and any elevator technicians called in to the premises should have ready access to the key. It is noted that the article covers the installation of electrical equipment and wiring for elevators, dumbwaiters, escalators, moving walks, platform lifts and stairway chairlifts. endstream
endobj
954 0 obj
<. These are part of Article 725, Class 1, Class 2 and Class 3 Remote-Control, Signaling, and Power-Limited Circuits. But, building codes had been in existence for many centuries. The panel further clarified that the marked SCCR value must be adequate for the available fault current to ensure a safe installation. This strategy works to improve the flexibility of the traveling cable, but it is contrary to a general NEC rule concerning the paralleling of conductors, which is generally done in very large sizes to avoid unwieldy wire pulls and terminations. NEC 620.62 requires the elevator disconnecting means (fused switch or circuit breaker) to selectively coordinate with all supply-side overcurrent devices. Good documentation is of key importance to recalling what decisions were made and why. ASME A17.1, Section 2.2.5, National Electrical Code, Rule 620-85 4. Granle is a licensed professional engineer with Sebesta Blomberg & Associates, Rochester, Minn. https://www.facebook.com/ElectricalConstructionMaintenanceMagazine, https://www.linkedin.com/company/electrical-construction-maintenance/, ABCs Construction Backlog Indicator Down to Start 2023, The Most Popular Code Quizzes of the Week from 2021, The 10 Most Popular Photo Galleries of 2021, Whats Wrong Here? In the event of a breakdown, that phone must automatically call a location staffed 24 hours a day. It does specify wiring methods allowed, though, in 620. Otherwise, specify that the elevator supplier provide a battery back-up unit to power the lights in the event of an outage. Freight Elevator Door Control: An Opportunity for Wireless Technology. All Rights Reserved | Contact Us | Privacy Policy. Many undertake trips in these devices two or more times daily in full confidence that they will survive an uneventful experience with a minute chance of disaster or even inconvenience. It is further stipulated that internal voltages of power-conversion equipment and functionally associated equipment, and the operating voltages of wiring interconnecting the equipment, are permitted to be higher, provided that the equipment and wiring are listed for the higher voltages. If the entire feeder/branch circuit assembly were to be protected in the conventional manner, the motor would cut out long before reaching operating speed. Both electric and nonelectric elevators are to comply with Article 250, the code article that covers grounding and bonding in general. CLAIMED . 1993 NEC 15-20 Amp 120 volt Receptacle Requirements: Wet bar sinks, all bathrooms, roof tops, elevator machines rooms, elevator car tops, elevator pits. Elevator cab lights require emergency back-up power. The electrical energy does not traverse the human body, but proximity to the explosion means severe injury is possible from the intense heat and concussive shockwave. The basic idea is that there must be a separate, dedicated circuit for car lights, receptacles and ventilation on each car. This clear working space must be 30 in. Machine room-less elevator installations incorporate the elevator controller and often the primary disconnecting means in a convenient package that is located within the elevator shaft. The basic wiring methods are rigid-metal, rigid nonmetallic or intermediate-metal conduit; electrical metallic or rigid nonmetallic tubing; wireways; or Type MC, MI or AC cable, unless otherwise permitted. For example, it is stated that the cross-sectional area of the individual conductors in a wireway are not to exceed 50% of the interior cross-sectional area of the wireway. (B) Lighting Switch. Section 620.37 re-emphasizes that only wiring used in connection with the elevator is permitted within the hoistway, machine room, control room/machinery space or control space. Flexible cords and cables that are components of listed equipment and used in circuits operating at 30 V (42 VDC) or less are permitted in lengths not to exceed 6 ft., provided the cords and cables are supported and protected from physical damage and are of a jacketed and flame-retardant type. There are options available to achieve this depending upon the customers needs. Get directions, reviews and information for Eazylift Albany LLC in Latham, NY. Fuses: Verify that the correct size, type and capacity are installed. Flexible cords and cables (same conditions as within hoistways). Luminaires must be lensed or equipped with wire guards to protect the lamps. They are to be located so as to be protected from physical damage, are to be of a flame-retardant type, and must be part of listed equipment, a driving machine or a driving-machine brake. However, space is frequently limited within the shaft and as such many ancillary components (shunt trip circuit breakers, fused disconnects) may need to be located outside of the elevator shaft. Nevertheless, the primary NEC focus is on elevators, and the intention is to mitigate the hazards associated with the use of electricity. You must run a separate insulated grounding conductor with the feeder conductors from the electrical source to the elevator controller. Elevator power disconnect (with utility feed marking) located in the machine room or other permitted location. To address this issue, Code Making Panel (CMP) 12 of the National Electrical Code acted on several proposed changes to Article 620 during the revision cycle for the 2017 NEC that deal with the proper installation of elevator controllers. Motor feeder short circuit and ground-fault protection must be as required in Article 430, Part V for all motors. Mainline disconnect: DO NOT OPEN THE MAINLINE DISCONNECT SWITCH COVER unless employees are authorized, properly trained and appropriate measures are taken commensurate with the higher risk of arc-flash hazards. Metal grating shall be installed over the hole that sits flush with the pit floor. [emailprotected] To avoid this situation, designers can specify elevator controls with a safety feature commonly called a rescuvator. Requirements in Article 620 modify the articles in Chapter 3. Many NEC articles address voltage limitations, and Article 620 is no exception. 0
Special conditions: Troubleshooting in wet, hot or cold conditions calls for extra caution. Please check your entries and try again. In driving through commercialized suburban areas, you frequently see paralleled conductors for large retail grocers (where there is a heavy refrigeration load). Accordingly, for this application, the minimum size is reduced to 20 AWG for lighting circuits. In elevators provided with Firefighters' Emergency Operation, a drain or sump pump shall be provided. Mike Holt. or larger is permitted to be installed in lengths in excess of 6 ft. Where motor-generators, machine motors or pumping-unit motors and valves are located adjacent to or underneath control equipment and provided with extra-length terminal leads not exceeding 6 ft. in length, such leads are permitted to be extended to connect directly to controller terminal studs without regard to carrying-capacity requirements. This is somewhat broader than A17.1-2007/B44-07. Use the below learning-reinforcement questions to study for the Continuing Education Assessment Exam available online at www.elevatorbooks.com or on page 81 of this issue. Which equipment requires a separate branch circuit in the elevator car? Is lighting required to be GFCI protected in the machine room? Where is the lighting switch to be located in the machine room? What is the maximum raceway conductor fill in an elevator hoistway? How many disconnecting means are required for an elevator power supply? Based on the analysis, the arc-flash boundaries at the elevator/escalator controllers ranged from 3-16 in. +;-mka|7! No provision is to be made to automatically restore power. As we have seen, a limited number of these are approved for elevator locations car, hoistway, pit and machine room. So, we see that for elevator work, greater fill is allowed. First, the ATS signals the elevators that it's about to switch over to emergency power preferably 30 sec or more prior to switching, which allows the elevator controller to bring each elevator cab to the nearest landing and stop, thus protecting the motors and electrical system. Per the 2017 NEC, if the elevator is designated as an emergency system load, the disconnect must be protected by a surge protective device (SPD). Louisiana State Uniform Construction Code Council adopts the 2014 NEC, Basic three-phase power measurements explained, Safety After the Storm Operating Portable Generators. Modern electronic elevator controls can be sensitive to temperature shifts. Because they need to move and flex, traveling cables are not required to be in a raceway. If the disconnecting means is an integral part of the motor controller, it is to be operable without requiring opening of the enclosure. The 12 definitions provided in NEC 2011, Section 620.2 are the place to start for guidance in this area, and the sections that follow lay out implementation guidelines that are very relevant in todays environment. The fan should be on a dedicated circuit. The many codes and guidelines that regulate the electrical design of an elevator can seem overwhelming, and dealing with the electrical inspector, elevator inspector, and Fire Marshal can be even more intimidating. This switch will ensure that the elevator won't descend into the elevator pit and allow maintenance people to work safely in the area beneath the cab. The thinking behind this requirement is that the injured worker could have severe hand burns and be unable to operate a conventional doorknob. The two main types of elevators are hydraulic and traction. First, the traveling cable must be composed of very fine-stranded conductors so it can flex with a minimum of internal stresses, ensuring long service life and reliability. Doors must open in the direction of travel and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Society of Mechanical Engineers. APPENDIX A 2.2. The basic rule for conductor fill of a metal wireway, as given in Article 376, is that the sum of the cross-sectional areas of all contained conductors at a cross section of a wireway is not to exceed 20% of the interior cross-sectional area of the wireway. NEC Article 620 contains numerous other disconnect provisions, which must be carefully scrutinized prior to design work so the installation is compliant. It is further stressed that no provision is to be made to open or close the disconnecting means from any other part of the premises. Always verify all conditions and requirements with the state and the AHJ where the installation is taking place. Specifically, Section 725.43 provides that overcurrent protection for conductors 14 AWG and larger is to be provided in accordance with the conductor ampacity without applying ampacity adjustment and correction factors. 836 Troy Schenectady Road ; Latham, NY 12110 . Generally, it is decreed that the supply voltage is not to exceed 300 V between conductors (allowing for the familiar 240-V concept), although there are exceptions. It is important to note, that these selective coordination tables can indicate a lack of selective coordination at a given fault current for circuit breakers that do not show overlap on the time-current curves of the circuit breakers. or larger, not exceeding 6 ft. in length, are permitted between control panels and machine motors, machine brakes, motor-generator sets, disconnecting means and pumping motors and valves. You'll need to run telephone cables to the equipment room control panel, but the elevator supplier will take care of getting the cables to the elevator cab. N _rels/.rels ( j0@QN/c[ILj]aGzsFu]U
^[x 1xpf#I)Y*Di")c$qU~31jH[{=E~ %%EOF
Sign up for our free e-newsletter. You are a subscriber that needs to Sign In. : inspecting; troubleshooting; observing; etc.) One way to achieve this is by paralleling wires, i.e., connecting the runs at both ends so they are physically like two wires but electrically one. Flexible cords and cables, or conductors grouped together and taped or corded, are permitted to be installed without a raceway.